Rates partly published · Foley, AL
Flight training at Lightning Aviation
No instructor rate. Lightning Aviation publishes rates for all 4 of its airplanes and nothing for instruction, so there is no total on this page. Instruction is the second biggest line on a training bill, after the airplane.
Checked August 13, 2026 against AOPA flight school finder, Lightning Aviation at 5R4.
- Based at
- Foley Municipal Airport(5R4)
- FAA part
- Not stated on their site
- Trains
- PPL · IR · CPL · Multi · CFI · CFII
- Website
- lightningaviationfoley.com
What Lightning Aviation publishes
Checked August 13, 2026 · Source
| Aircraft | Published rate | Notes |
|---|---|---|
| Cessna 172 (VFR/IFR) | $180/hr | The school operates seven IFR Garmin and Dynon equipped 172s. |
| Aeronca Champ 7AC | $140/hr | Tailwheel. |
| Citabria 7KCAB | $165/hr | Tailwheel and aerobatic. |
| Piper Twin Comanche PA-30 | $320/hr | Multi-engine. |
Lightning also sells multi-engine time building in ten-hour blocks at $4,000, starting at eleven hours.
What to ask when you call
The marked ones are what Lightning Aviation's site never answers. The rest are what turns an hourly rate into a real bill.
What do you charge per hour for flight instruction, and is ground instruction billed at the same rate?Missing from their site
This is the number that is missing from the site. Ground is often billed separately and at a different rate.
Does the instructor rate change for the Instrument, Commercial, or CFI, or is it flat across everything?Missing from their site
Plenty of schools charge more for advanced instruction. A flat rate quoted for the Private can climb later.
What does instruction cost, and is the tailwheel or multi rate different?Missing from their site
Four aeroplane rates are published across three very different categories and no instruction rate for any of them.
Does the multi-engine time-building block include an instructor?
A ten-hour block is priced but the page does not say whether a CFI is in it, which changes what the hour is worth toward a rating.
Do you offer block rates or prepay discounts, and what is the refund policy if I stop partway?
Block discounts are common and rarely published. The refund terms matter more than the discount.
What do you charge for the written test, the checkride, and the examiner's fee?
The DPE fee alone runs $800 to $1,200 in most of the country and is almost never in a quoted hourly rate.
How many trainers and how many full-time instructors do you have right now?
Availability decides your pace, and pace decides your total more than the hourly rate does.
What to compare their answer against
Not Lightning Aviation's rates. The middle of what 5 Alabama schools charge, to hold your phone quote against.
Trainer, median
$180/hr
Range $155 to $185
Instruction, median
$55/hr
Across 5 schools with published rates
From the schools here that publish full rate cards, the same sample behind the Flight Training Cost Report. Lightning Aviation is not in it.
Called them? Send us what they said.
Send the number over and Lightning Aviation gets a full listing with an estimate, marked as sourced by phone on the date you called.
Send what they told youWhat we checked
A seven-aeroplane 172 fleet plus two tailwheel types and a Twin Comanche, all priced, with no instruction rate anywhere. Checked August 13, 2026.
Are you Lightning Aviation? Send your rate card and this becomes a full listing with an estimate, free. Or have it removed.
PilotBound is not affiliated with, endorsed by, or sponsored by Lightning Aviation. School names are used only to identify the school.Rates shown are the school's own published figures with the date we checked them. This page carries no PilotBound estimate, because the school does not publish enough for one. Disclaimer & removal policy.
Other Alabama flight schools
- ACOM Aviation Academy · Dothan
- Aeropro · Selma
- Albertville Aviation · Albertville
- Birmingham Flight Center · Birmingham
- Blackstone Aviation · Hartselle
- Blue Skies Above Flight School · Lanett
- Box Aviation · Montgomery
- Brown Aero Technologies · Alexander City
- Cheaha Flight Training · Oxford
Plan the money before you commit
A program price only makes sense next to what each rating costs on its own, what free money exists, and what borrowing actually looks like.
What each rating costs
Honest per-rating ranges, with the fees most quotes leave out.
Free money first
Verified flight training scholarships. Every scholarship dollar is a dollar you never finance.
If you borrow
Compare lenders and see the real monthly payment before you sign.