
Parrish Aviation Flight Academy
Part 141 accelerated academy with 2 campuses in Texas.
Prices checkedChecked October 24, 2026 by Samip Shah, CFI, CFII, AGI
At a glance
- 2 programs.
- From Private Pilot through Instrument Instructor.
- Campuses in Dallas and Fort Worth.
- The Full Career Program (Cessna 172) is $99,951.
Basics
| Training rules | Part 141 |
|---|---|
| Certificates | Private Pilot, Instrument Rating, Commercial Pilot, Multi-Engine (AMEL), Flight Instructor, Instrument Instructor |
| Campuses | Dallas (KRBD), Fort Worth (T67) |
| Website | parrishaviation.com |
Programs
Assumes the program's planned hours. Most students fly over the minimums, and the extra flight time is billed separately.
The published total assumes the programme's 240 flight hours. The school says exact cost depends on the hours a student actually flies, the examiner chosen and its current aircraft rates, so flying over the plan is billed on top.
- Full Career Program (Cessna 172)
- $99,951
- PPL · IR · CPL · Multi · CFI · CFII · 240 hrs
- October 24, 2026Source
- Excludes non-owner's insurance, the medical exam fee and FAA test fees. The school also notes that building from the programme's hours to the 1,500-hour ATP minimum is largely self-funded by instructing.
- 240 flight hours plus 50 in the simulator.
- Full Career Program (Sling NGT)
- $104,950
- PPL · IR · CPL · Multi · CFI · CFII · 240 hrs
- October 24, 2026Source
- Excludes non-owner's insurance, the medical exam fee and FAA test fees. The school also notes that building from the programme's hours to the 1,500-hour ATP minimum is largely self-funded by instructing.
- The same programme flown in the glass-cockpit Sling NGT rather than the Cessna 172.
An academy program does not lower the 1,500-hour airline minimum. Only a qualifying degree does.
Campuses
Weather
What counts as a flyable day
Clouds no lower than 3,000 feet and visibility of 5 miles or more (VFR weather) for at least half the hours between 9 am and 5 pm. Hourly observations from the airport's own weather station, 2016 to 2025. Source: Iowa Environmental Mesonet ASOS archive, Iowa State University.
Weather
What counts as a flyable day
Clouds no lower than 3,000 feet and visibility of 5 miles or more (VFR weather) for at least half the hours between 9 am and 5 pm. Hourly observations from Fort Worth - Alliance (KAFW), 5 nm away, 2016 to 2025. Source: Iowa Environmental Mesonet ASOS archive, Iowa State University.
Aerial imagery: USDA NAIP imagery via the USGS National Map
Paying for it
Two ways to cover $99,951.
Win what you can first, then borrow only what is left.
- Money you keepScholarships you could apply for43 open to anyone. Top awards reach $22,200.No Texas-only awards in the directory yet.
- 43
- Money you pay backLenders that cover $99,951Four of the six lenders in our comparison lend this much. That is whether a loan this size is on offer, not whether you would be approved.
- 4 of 6
In the app
Track your training at Parrish Aviation.
Enter the aircraft and instructor rates for your training at Parrish Aviation Flight Academy when you set up PilotBound, and the app tracks every flight you log against the projection. On a fixed-price program, it shows what the hours you actually fly would cost by the hour, to set beside the package.

Questions
How much does Parrish Aviation Flight Academy cost?
Parrish Aviation Flight Academy publishes $99,951 for its Full Career Program (Cessna 172), as listed on the academy's own pricing page (October 24, 2026). It publishes 2 tracks in total, priced by how much flight experience you start with. That is the published sticker for the program, not a personalized quote, and it is what the academy asks before the fees the sticker excludes.
What is included in Parrish Aviation Flight Academy's program price?
Parrish Aviation Flight Academy's published programs cover Private Pilot, Instrument Rating, Commercial Pilot, Multi-Engine (AMEL), Flight Instructor and Instrument Instructor. The headline track plans for about 240 flight hours. On what it excludes, the academy states: Excludes non-owner's insurance, the medical exam fee and FAA test fees. The school also notes that building from the programme's hours to the 1,500-hour ATP minimum is largely self-funded by instructing.
What happens if you need more hours than Parrish Aviation Flight Academy's program includes?
Assumes the program's planned hours. Most students fly over the minimums, and the extra flight time is billed separately. The published total assumes the programme's 240 flight hours. The school says exact cost depends on the hours a student actually flies, the examiner chosen and its current aircraft rates, so flying over the plan is billed on top. This is the question worth asking hardest at any accelerated academy, because the published price and the price a student who flies over the plan actually pays are two different numbers.
Does going to Parrish Aviation Flight Academy lower the 1,500-hour airline requirement?
No. An accelerated academy does not reduce the 1,500-hour ATP minimum. Only a qualifying aviation degree does, under 14 CFR 61.160, which lowers it to 1,000 hours for a bachelor's or 1,250 for an associate's. What an academy sells is speed and a fixed price to the commercial certificate and instructor ratings, not a shortcut to the airlines. Most graduates then instruct to build the remaining hours.
Sources
Figures are Parrish Aviation Flight Academy's own published program prices, each with its date and source. A student's actual cost will differ with location premiums, the fees a price excludes, and pace. How hours past the program's plan are billed varies by academy, so ask Parrish Aviation for its policy. PilotBound is not affiliated with Parrish Aviation Flight Academy. Disclaimer & removal policy.
Primary sources: parrishaviation.com· parrishaviation.com
Plan the money before you commit.
A program price only makes sense next to what each rating costs on its own, what scholarships exist, and what borrowing actually looks like.
What each rating costs
Per-rating ranges, with the fees most quotes leave out.
Scholarships first
Verified flight training scholarships. Every scholarship dollar is a dollar you never finance.
If you borrow
Compare lenders and see the real monthly payment before you sign.



