PilotBound estimate · Salida and Buena Vista, CO · Checked September 5, 2026

What flight training at Seven Peaks Aviation costs

Website sevenpeaksaviation.com

Your plan

Estimate cost to reach

Flying

Wet. Based at Salida.

PilotBound estimate · Private

Examiner data

Cost of your Private at Seven Peaks Aviation

$16,655

range $14.3K$19K · about 6 months at 2×/week

Priced on Seven Peaks's published rates: Cessna 172M at $150/hr + $60/hr instruction, checked September 5, 2026.

Against a minimums quote

at the FAA legal minimums$10,295
at the hours students actually take$16,655

+$6,360 on Seven Peaks's own rates. Quotes usually price the 40-hour minimum; almost nobody finishes there.

Where it goes

$14.3K$19K
Aircraft rental$10,800
Instruction$3,480
One-time costs$2,375
Aircraft + instruction$14,280
72 hrs in Cessna 172M @ $150/hr + 58 dual @ $60/hr

One-time fees ($2,375)

  • Knowledge (written) test$175
  • Checkride / DPE fee$800
  • Medical certificate$150
  • Headset$700
  • Ground school / test prep$300
  • Books, charts & supplies$250
Hours at a steady pace72 hrs

Examiner records (DPE dataset).

The hourly flying is priced on Seven Peaks Aviation's published rates. About $2,375 of this is one-time fees (written test, examiner/DPE checkride, medical, gear), typical national estimates, not Seven Peaks Aviation's prices, and several are set by third parties.

Estimates use PilotBound's own completion-hours model, examiner-completion data where it exists and FAA minimums where it does not, applied to each school's published rates. They are PilotBound estimates, not the school's quote, and will differ from a school's own figures. Full methodology and sources →

What Seven Peaks publishes

checked September 5, 2026
Cessna 172M (N12170)Wet. Based at Salida.$150/hr wet
Cessna 182F (N75SM)Wet. High performance. Based at Buena Vista and Leadville.$225/hr wet
Instructionstandard $60/hr · instrument instruction $65/hr$60 – $65/hr

Both airplanes are published wet on the rates page. The home page shows the 172 at $140/hr against the rates page's $150; the rates page is used. Instruction is a $60/hr base with $5/hr added for instrument work, $10/hr for mountain instruction and $10/hr in a student-owned airplane. The 182 is based at Buena Vista and Leadville rather than Salida.

Not published: the examiner's checkride fee. Listed as missing rather than guessed.

See the published ratesSource 2

Paying for it

Two ways to cover $16,655.

Win what you can first, then borrow only what is left. Neither figure assumes anything about you: one is what our scholarship directory holds, the other is what the lenders publish.

Scholarships you could apply forTop awards reach $22,200. Every dollar won is a dollar you never finance.
68
Lenders that cover $16,655All six lenders in our comparison lend this much. That is whether a loan this size is on offer, not whether you would be approved.
6 of 6

Next leg

Turn this into a plan.

Your $16,655 is the starting line. Turn it into a route to your checkride, every step in order with this cost built in.

Add to my plan

What to ask when you call

The marked one is what Seven Peaks's site never answers. The rest are what turns an hourly rate into a real bill.

  1. What gets billed on top of the hourly rates, and roughly how much per hour does it add?

    The site notes extras beyond the hourly figures. Ask for the all-in number per hour, not the base rate.

  2. Which instructor rate applies to each rating I plan to do, and does the higher tier start on day one of that rating?

    This school prices some instruction above its primary rate. Knowing when the step-up starts keeps the later ratings from surprising you.

  3. Do you train under Part 61 or Part 141?Missing from their site

    It changes the minimum hours, and for some students it changes financing eligibility.

  4. Do you offer block rates or prepay discounts, and what is the refund policy if I stop partway?

    Block discounts are common and rarely published. The refund terms matter more than the discount.

  5. What do you charge for the written test, the checkride, and the examiner's fee?

    The DPE fee alone runs $800 to $1,200 in most of the country and is almost never in a quoted hourly rate.

  6. How many trainers and how many full-time instructors do you have right now?

    Availability decides your pace, and pace decides your total more than the hourly rate does.

Estimates use Seven Peaks Aviation's published Cessna 172M and instructor rates (checked September 5, 2026), shown in USD for planning only. Real cost varies by student, weather, and pace. An honest range, not a quote.

PilotBound is not affiliated with, endorsed by, or sponsored by Seven Peaks Aviation. School names are used only to identify the school. Estimates use PilotBound's own completion-hours model, examiner-completion data where it exists and FAA minimums where it does not, applied to each school's published rates. They are PilotBound estimates, not the school's quote, and will differ from a school's own figures. Disclaimer & removal policy.

Common questions about Seven Peaks Aviation

How much does it cost to get a private pilot license at Seven Peaks Aviation?
Seven Peaks Aviation publishes $150 per hour for the Cessna 172M and $60 per hour for instruction on it, checked September 5, 2026. Applied to those published rates, PilotBound estimates a private pilot certificate at about $16,655, in a range of $14,300 to $19,000. That covers roughly 72 hours of flying and instruction plus the one-time fees most quotes leave out, including the written test, the examiner's checkride fee, a medical, and study materials. It is a PilotBound estimate built on the school's published rates, not a quote from Seven Peaks Aviation.
How long does it take to get a private pilot license at Seven Peaks Aviation?
Flying twice a week, PilotBound estimates about 6 months at Seven Peaks Aviation to reach the private pilot checkride, at roughly 72 hours. Pace is the single biggest variable: flying once a week typically stretches the timeline and raises the total, because time between lessons gets spent re-learning. Weather, aircraft availability, and instructor turnover all push the same direction.
Is Seven Peaks Aviation a Part 61 or Part 141 flight school?
Seven Peaks Aviation does not state on its own website whether it trains under Part 61 or Part 141, so we do not list one. It is worth asking directly before you enroll: Part 141 follows an FAA-approved syllabus and is generally what VA benefits require, while Part 61 is more flexible on scheduling.
Do Seven Peaks Aviation's aircraft rates include fuel?
Seven Peaks Aviation publishes $150 per hour for the Cessna 172M, a wet rate, so fuel is included in the hourly figure. A wet rate is the easier one to compare, because the number you see is the number you fly on. Rates checked September 5, 2026.
What ratings can you train for at Seven Peaks Aviation?
Seven Peaks Aviation trains Private Pilot, Instrument Rating and Commercial Pilot. Instruction runs $60 to $65 per hour depending on the rating and the aircraft, since advanced and type-specific instruction is priced above the standard rate. PilotBound's estimator on this page prices any of these paths on Seven Peaks Aviation's own published rates.

Other Colorado flight schools

All Colorado flight schools

Plan the money before you commit

A program price only makes sense next to what each rating costs on its own, what free money exists, and what borrowing actually looks like.

What each rating costs

Honest per-rating ranges, with the fees most quotes leave out.

Free money first

Verified flight training scholarships. Every scholarship dollar is a dollar you never finance.

If you borrow

Compare lenders and see the real monthly payment before you sign.