Rates partly published · Beaver Falls, PA
Flight training at ACES Aviation
No instructor rate. ACES publishes rates for all 4 of its airplanes and nothing for instruction, so there is no total on this page.
Checked August 17, 2026 against AOPA flight school finder, ACES Aviation at BVI.
- Based at
- Beaver County Airport(BVI)
- FAA part
- Part 61 and Part 141
- Trains
- PPL · CPL · CFI · CFII
Section 1What is published
ACES's own figures
Checked August 17, 2026 · Source
| Aircraft | Published rate | Notes |
|---|---|---|
| Diamond DA20 C1 | $155/hr | Two-seat. Priced as the aircraft with fuel. |
| Cessna 172 (N5990E)1978 | $155/hr | Aspen display, GNS430, GTX330 with TIS-B traffic. Rate includes aircraft and fuel. |
| Diamond DA40 180 G1000 | $185/hr | Glass. |
| Beechcraft Baron BE58A | $370/hr | Twin. |
Airframe built 1978. Years of manufacture from the FAA aircraft registry, read October 4, 2026.
Every aircraft page states the rate includes fuel. A Diamond MATE AATD simulator is listed with no price.
Section 2Why there is no total
An estimate needs an instructor rate.
A training total is hours multiplied by rates. With instruction unpriced there is nothing to multiply, and we will not fill the gap with a plausible number: every figure on this site carries a link that shows it today.
Instructor rateMissing from their site
Instruction is the second biggest line on a training bill, after the airplane.
What to compare their answer against
Not ACES's rates. The middle of what 18 Pennsylvania schools charge, to hold your phone quote against.
- Trainer, medianWhat the airplane costsRange $132 to $231 per hour.
- $180
- Instruction, medianWhat the instructor costsAcross 18 schools with published rates.
- $65
From the schools here that publish full rate cards, the same sample behind the Flight Training Cost Report. ACES is not in it.
Section 3Paying for it
Two ways to pay for it.
Win what you can first, then borrow only what is left. Neither figure assumes anything about you: one is what our scholarship directory holds, the other is what the lenders publish.
- Money you keepScholarships you could apply for51 open to anyone. Top awards reach $22,200.No Pennsylvania-only awards in the directory yet.
- 51
- Money you pay backLenders that fund flight trainingSix lenders, compared on the limits and rates they publish. That is what is on offer, not whether you would be approved.
- 6
Section 4What to ask
What to ask when you call
The marked ones are what ACES's site never answers. The rest are what turns an hourly rate into a real bill.
What do you charge per hour for flight instruction, and is ground instruction billed at the same rate?Missing from their site
This is the number that is missing from the site. Ground is often billed separately and at a different rate.
Does the instructor rate change for the Instrument, Commercial, or CFI, or is it flat across everything?Missing from their site
Plenty of schools charge more for advanced instruction. A flat rate quoted for the Private can climb later.
What does instruction cost per hour, and does the Baron carry its own rate?Missing from their site
All four aircraft are priced to the dollar with fuel included, and no instructor rate appears anywhere on the site.
Do you offer block rates or prepay discounts, and what is the refund policy if I stop partway?
Block discounts are common and rarely published. The refund terms matter more than the discount.
What do you charge for the written test, the checkride, and the examiner's fee?
The DPE fee alone runs $800 to $1,200 in most of the country and is almost never in a quoted hourly rate.
How many trainers and how many full-time instructors do you have right now?
Availability decides your pace, and pace decides your total more than the hourly rate does.
Called them? Send us what they said.
Send the number over and ACES Aviation gets a full listing with an estimate, marked as sourced by phone on the date you called.
Send what they told youSection 5In the app
Section 6Nearby schools
One other school flies from Beaver County Airport.
It publishes a full rate card, so you can compare before you call. BVI is the identifier to give when you ask.
- Moore AviationFull rate card, Cessna 152 at $150/hr and $50/hr instructionBeaver Falls
18 Pennsylvania schools publish a full rate card.
Each one has an estimate built on its own published rates. Listed alphabetically, because ordering them by price would be a ranking this page is not making.
- Ace Pilot TrainingAllentown, PA · Checked September 16, 2026$160/hr$65 to $75/hr instruction
- Aero-Tech ServicesLititz, PA · Checked September 10, 2026$231/hr$85/hr instruction
- Chester County AviationCoatesville, PA · Checked September 16, 2026$185/hr$74/hr instruction
- Cloud 9 AviationWashington & West Mifflin, PA · Checked October 4, 2026$145/hr$50 to $60/hr instruction
- Fundamentals Flight TrainingErie, PA · Checked October 4, 2026$180.4/hr$60/hr instruction
- Haski AviationNew Castle, PA · Checked September 16, 2026$150/hr$47 to $60/hr instruction
Section 7Sources
- That the school exists
- AOPA flight school finder, ACES Aviation at BVIChecked August 17, 2026
- The rates above
- ACES Aviation Cessna 172 pageChecked August 17, 2026
Are you ACES Aviation? Send your rate card and this becomes a full listing with an estimate, free. Or have it removed.
This page says one thing is not stated on your site. Send us where it is published and it shows here instead.
- What instruction costs per hourSend it
PilotBound is not affiliated with, endorsed by, or sponsored by ACES Aviation. School names are used only to identify the school. Rates shown are the school's own published figures with the date we checked them. This page carries no PilotBound estimate, because the school does not publish enough for one. Disclaimer & removal policy.
Other Pennsylvania flight schools
- Ace Pilot Training · Allentown
- Aero-Tech Services · Lititz
- AFAF Aviation · Philadelphia
- AirQuest Aviation · Butler
- Alle-Catt Flight Training · Lewis Run
- Armstrong Aviation Services · Freeport
- Arner Flying Service · Lehighton
- Aviation Technologies · Avoca
- Borzoya Aero · Slatington
Plan the money before you commit
A program price only makes sense next to what each rating costs on its own, what free money exists, and what borrowing actually looks like.
What each rating costs
Honest per-rating ranges, with the fees most quotes leave out.
Free money first
Verified flight training scholarships. Every scholarship dollar is a dollar you never finance.
If you borrow
Compare lenders and see the real monthly payment before you sign.


