Aerial photo of Tradewind Airport, Amarillo, TX
Imagery: USDA NAIP

Coyote Flight Centers

Flight training from Private Pilot through Commercial Pilot at Tradewind Airport.

Checked October 12, 2026 by Samip Shah

At a glance

  • 3 aircraft types.
  • A private pilot certificate here, flying 2x a week, is estimated at $16,795.

Basics

CertificatesPrivate Pilot, Instrument Rating, Commercial Pilot
Websitecoyoteflight.com
Phone(806) 335-9763

Aircraft and rates

3 types

A Piper Cherokee
A Piper Cherokee (N9607W), not this school’s aircraft. Photo: Tomás Del Coro from Fabulous Las Vegas, Nevada, USA, CC BY-SA 4.0.

Piper Cherokee PA28-180

The primary trainer.

Rate (fuel basis not stated)
$160/hr

Instruction and rate notes

Checked October 12, 2026
Instruction$50/hr

If the rates turn out to be dry, fuel adds roughly $30 to $60 an hour.

The examiner's checkride fee is paid separately. The website doesn't say whether rates include fuel. The estimate uses Part 61 hours. Coyote Flight doesn't say whether it trains under Part 61 or 141.

Airport

  • Aerial photo of Tradewind Airport

    Tradewind KTDW

    Home field · 2 runways · longest 5,098 ft · asphalt

    View on the map

Aerial imagery: USDA NAIP imagery via the USGS National Map

Weather

336
flyable days a year
Jun to Sep
most flyable months
25 of 28
in February, the fewest
Flyable 336Low clouds or poor visibility 30
If you start in

In an average year, January to June has 164 flyable days out of 181. That is the six months your estimate covers, marked under the chart.

What counts as a flyable day

Clouds no lower than 3,000 feet and visibility of 5 miles or more (VFR weather) for at least half the hours between 9 am and 5 pm. Hourly observations from Amarillo - Rick Husband Intl (KAMA), 7 nm away, 2016 to 2025. Source: Iowa Environmental Mesonet ASOS archive, Iowa State University.

What it costs

Certificate

Flying

Hours

The primary trainer.

72 hrs
What students typically take.
Where this comes fromExaminer records (DPE dataset).

PilotBound estimate

$16,795

Usually $14,400 to $19,100 · about 6 months

  • Airplane72 hrs in Piper Cherokee PA28-180 × $160/hr$11,520
  • Instructor58 hrs dual × $50/hr$2,900
  • One-time feesWritten test, checkride, medical, headset and more$2,375
    • Knowledge (written) test$175
    • Checkride / DPE fee$800
    • Medical certificate$150
    • Headset$700
    • Ground school / test prep$300
    • Books, charts & supplies$250

The hourly flying is priced on Coyote Flight Centers's published rates. The one-time fees are typical national figures, not Coyote Flight Centers's prices, and several are set by third parties.

Paying for it

Two ways to cover $16,795.

Win what you can first, then borrow only what is left.

Money you keepScholarships you could apply for43 open to anyone. Top awards reach $22,200.No Texas-only awards in the directory yet.
43
Money you pay backLenders that cover $16,795All six lenders in our comparison lend this much. That is whether a loan this size is on offer, not whether you would be approved.
6 of 6

What to ask when you call

Not on their website

  1. Do the published aircraft rates include fuel, or is fuel billed separately?

    Two rates that look the same can differ by the cost of fuel.

  2. Do you train under Part 61 or Part 141?

    It changes the minimum hours, and for some students, financing.

Also ask

  1. Do you offer block rates or prepay discounts, and what is the refund policy if I stop partway?

    Block discounts are rarely published, and the refund terms matter more than the discount.

  2. What do you charge for the written test, the checkride, and the examiner's fee?

    The examiner's fee alone runs $800 to $1,200 in most of the country.

  3. How many trainers and how many full-time instructors do you have right now?

    Availability sets your pace, and pace drives your total more than the hourly rate.

In the app

Track it against Coyote Flight's rates.

Coyote Flight Centers's rate card is in the PilotBound app. Choose Coyote Flight when you set up and the app prices your training at its rates, then tracks every flight you log against the projection.

Download on the App Store

Questions

How much does it cost to get a private pilot license at Coyote Flight Centers?

Coyote Flight Centers publishes $160 per hour for the Piper Cherokee PA28-180 and $50 per hour for instruction on it, checked October 12, 2026. Applied to those published rates, PilotBound estimates a private pilot certificate at about $16,795, in a range of $14,400 to $19,100. That covers roughly 72 hours of flying and instruction plus the one-time fees most quotes leave out, including the written test, the examiner's checkride fee, a medical, and study materials. It is a PilotBound estimate built on the school's published rates, not a quote from Coyote Flight Centers.

How long does it take to get a private pilot license at Coyote Flight Centers?

Flying twice a week, PilotBound estimates about 6 months at Coyote Flight Centers to reach the private pilot checkride, at roughly 72 hours. Pace is the single biggest variable: flying once a week typically stretches the timeline and raises the total, because time between lessons gets spent re-learning. Weather, aircraft availability, and instructor turnover all push the same direction.

Is Coyote Flight Centers a Part 61 or Part 141 flight school?

Coyote Flight Centers's website doesn't say whether it trains under Part 61 or Part 141. Ask before you enroll: Part 141 follows an FAA-approved syllabus and is generally what VA benefits require, while Part 61 is more flexible on scheduling.

Do Coyote Flight Centers's aircraft rates include fuel?

Coyote Flight Centers publishes $160 per hour for the Piper Cherokee PA28-180, a rate that does not say whether fuel is included. Ask before you budget: if the rate turns out to be dry, fuel adds roughly $30 to $60 per hour. Rates checked October 12, 2026.

What ratings can you train for at Coyote Flight Centers?

Coyote Flight Centers trains Private Pilot, Instrument Rating and Commercial Pilot. Instruction is $50 per hour across the ratings it teaches. PilotBound's estimator on this page prices any of these paths on Coyote Flight Centers's own published rates.

Sources

Estimates use Coyote Flight Centers's published Piper Cherokee PA28-180 and instructor rates (checked October 12, 2026), shown in USD for planning only. Real cost varies by student, weather, and pace. A range, not a quote.

PilotBound is not affiliated with, endorsed by, or sponsored by Coyote Flight Centers. School names are used only to identify the school. Estimates use PilotBound's own completion-hours model, examiner-completion data where it exists and FAA minimums where it does not, applied to each school's published rates. They are PilotBound estimates, not the school's quote, and will differ from a school's own figures. Methodology · Disclaimer & removal policy.

Are you Coyote Flight? Every figure here is yours, shown with its source and date.

Plan the money before you commit.

A program price only makes sense next to what each rating costs on its own, what scholarships exist, and what borrowing actually looks like.

What each rating costs

Per-rating ranges, with the fees most quotes leave out.

Scholarships first

Verified flight training scholarships. Every scholarship dollar is a dollar you never finance.

If you borrow

Compare lenders and see the real monthly payment before you sign.