
Platinum Aviation
Part 61 flight training from Private Pilot through Commercial Pilot at Spanish Fork Municipal Airport/Woodhouse Field.
Checked August 20, 2026 by Samip Shah, CFI, CFII, AGI
At a glance
- 9 aircraft across 7 types.
Basics
| Training rules | Part 61 |
|---|---|
| Certificates | Private Pilot, Instrument Rating, Commercial Pilot |
| Website | platinumaviationut.com |
Aircraft and rates
9 aircraft · 7 types

Diamond DA20-C1
Two-seat. Wet.
- At this school
- 3
- Built
- 1998 to 2001
- Rate
- $155/hr
| Tail | FAA model | Built | Rate (wet) |
|---|---|---|---|
| N968CTDiamond DA20-C1 | Diamond DA20-C1 | 1999 | $155/hr |
| N209NDDiamond DA20-C1 | Diamond DA20-C1 | 1998 | $155/hr |
| N763DCDiamond DA20-C1 | Diamond DA20-C1 | 2001 | $155/hr |
Model and year from the FAA aircraft registry, November 18, 2026.
| Instruction | Not published |
|---|
Every tail is wet. The course cost sheets bill ground instruction at $55/hr, and the dual-solo spread there matches, but no flight instruction rate is quoted. Those sheets also price a Diamond DA40 not on the fleet page, so confirm which airplanes are available. The Seneca is listed but multi-engine training isn't advertised.
Checked August 20, 2026 · Platinum Aviation fleet page
Airport

Spanish Fork Municipal Airport/Woodhouse Field KSPK
Home field · 1 runway · 6,500 ft · asphalt
Aerial imagery: USDA NAIP imagery via the USGS National Map
Weather
What counts as a flyable day
Clouds no lower than 3,000 feet and visibility of 5 miles or more (VFR weather) for at least half the hours between 9 am and 5 pm. Hourly observations from Provo Muni (Awos) (KPVU), 5 nm away, 2016 to 2025. Source: Iowa Environmental Mesonet ASOS archive, Iowa State University.
Paying for it
Two ways to pay for it.
Win what you can first, then borrow only what is left.
- Money you keepScholarships you could apply for43 open to anyone. Top awards reach $22,200.No Utah-only awards in the directory yet.
- 43
- Money you pay backLenders that fund flight trainingSix lenders, compared on the limits and rates they publish. That is what is on offer, not whether you would be approved.
- 6
What to ask when you call
Not on their website
What do you charge per hour for flight instruction, and is ground instruction billed at the same rate?
Ground instruction is often billed at a different rate.
What does flight instruction cost per hour, and is it the same rate as the $55/hr ground instruction on your course sheets?
The website prices ground instruction and never prices flight instruction, and those are commonly different numbers.
Also ask
Your course sheets price a Diamond DA40 that isn't on the fleet page. Which airplanes can I actually book?
The two pages disagree about the fleet, and the DA40 appears in every cost breakdown.
Do you train multi-engine in the Seneca?
The twin is published at an hourly rate but no multi-engine training is advertised anywhere on the website.
Do you offer block rates or prepay discounts, and what is the refund policy if I stop partway?
Block discounts are rarely published, and the refund terms matter more than the discount.
What do you charge for the written test, the checkride, and the examiner's fee?
The examiner's fee alone runs $800 to $1,200 in most of the country.
How many trainers and how many full-time instructors do you have right now?
Availability sets your pace, and pace drives your total more than the hourly rate.
Called them? Send us what they said.
Send the number over and Platinum Aviation gets a full listing with an estimate, marked as sourced by phone on the date you called.
Send what they told youIn the app
Is this your school?
Send Platinum's rate card and this page gets an estimate. Or have it removed.
Sources
- That the school exists
- Platinum Aviation fleet pageChecked August 9, 2026
- Rates
- Platinum Aviation fleet pageChecked August 20, 2026
PilotBound is not affiliated with, endorsed by, or sponsored by Platinum Aviation. School names are used only to identify the school. Rates shown are the school's own published figures with the date they were checked. This page carries no PilotBound estimate, because the school does not publish enough for one. Disclaimer & removal policy.
Plan the money before you commit.
A program price only makes sense next to what each rating costs on its own, what scholarships exist, and what borrowing actually looks like.
What each rating costs
Per-rating ranges, with the fees most quotes leave out.
Scholarships first
Verified flight training scholarships. Every scholarship dollar is a dollar you never finance.
If you borrow
Compare lenders and see the real monthly payment before you sign.


