Aerial photo of Mountain Home Municipal Airport, Mountain Home, ID
Imagery: USDA NAIP

American Made Aviation

Part 61 flight training at Mountain Home Municipal Airport.

Checked October 12, 2026 by Samip Shah

At a glance

  • Trains in the Van's RV-12iS light sport, Garmin glass.
  • A private pilot certificate here, flying 2x a week, is estimated at $16,945.

Basics

Training rulesPart 61
CertificatesPrivate Pilot
Websiteamericanmadeaviation.com
Phone(986) 777-1006

Aircraft and rates

A Van's RV-12
A Van's RV-12 (N622MM), not this school’s aircraft. Photo: ZLEA, CC BY-SA 4.0.

Van's RV-12iS light sport, Garmin glass

The only airplane. A special light-sport aircraft, so the advanced ratings are flown in the student's own aircraft rather than this one. Fuel basis not stated.

Rate (fuel basis not stated)
$150/hr

Instruction and rate notes

Checked October 12, 2026
Instructionstandard $65/hr · instrument instruction $75/hr · commercial instruction $75/hr · CFI candidates $75/hr · CFII candidates $75/hr$65 – $75/hr

One Van's RV-12iS light sport airplane at $150/hr for instructional or personal use, with a $1,350 ten-hour pre-pay; the rates page does not say whether fuel is included. Instruction is $65/hr for Sport, Recreational and Private work and $75/hr for instrument, commercial, instructor and ATP work. Those advanced ratings are taught in a student's own aircraft, because a special light-sport aircraft cannot be used for an instrument rating, so only the Private is listed as taught here.

The examiner's checkride fee is not on this card: the examiner sets it, not the school. The estimate above includes PilotBound's own figure for it. American Made's site does not state whether its rates include fuel.

Airport

  • Aerial photo of Mountain Home Municipal Airport

    Mountain Home Municipal KU76

    Home field · 1 runway · 5,000 ft · asphalt

    View on the map

Aerial imagery: USDA NAIP imagery via the USGS National Map

Weather

285
flyable days a year
Jul to Oct
most flyable months
18 of 28
in February, the fewest
Flyable 285Low clouds, poor visibility or storms 15Wind 65
If you start in

In an average year, January to June has 132 flyable days out of 181. That is the six months your estimate covers, marked under the chart.

What counts as a flyable day

At least three hours between 9 am and 5 pm with the cloud base at 3,000 feet or higher, visibility of 5 miles or more, wind at 15 knots or less with gusts under 20, and no thunderstorm, snow or freezing rain. Hourly observations from Mountain Home Afb (KMUO), 8 nm away, 2016 to 2025. Source: Iowa Environmental Mesonet ASOS archive, Iowa State University.

What it costs

Certificate

Flying

Airplane

Van's RV-12iS light sport, Garmin glass

Hours

The only airplane. A special light-sport aircraft, so the advanced ratings are flown in the student's own aircraft rather than this one. Fuel basis not stated.

72 hrs
What students typically take.
Where this comes fromExaminer records (DPE dataset).

PilotBound estimate

$16,945

Usually $14,600 to $19,300 · about 6 months

  • Airplane72 hrs in Van's RV-12iS light sport, Garmin glass × $150/hr$10,800
  • Instructor58 hrs dual × $65/hr$3,770
  • One-time feesWritten test, checkride, medical, headset and more$2,375
    • Knowledge (written) test$175
    • Checkride / DPE fee$800
    • Medical certificate$150
    • Headset$700
    • Ground school / test prep$300
    • Books, charts & supplies$250

The hourly flying is priced on American Made Aviation's published rates. The one-time fees are typical national figures, not American Made Aviation's prices, and several are set by third parties.

Paying for it

Two ways to cover $16,945.

Win what you can first, then borrow only what is left.

Money you keepScholarships you could apply for44 open to anyone. Top awards reach $22,200.No Idaho-only awards in the directory yet.
44
Money you pay backLenders that cover $16,945All six lenders in our comparison lend this much. That is whether a loan this size is on offer, not whether you would be approved.
6 of 6

What to ask when you call

The marked one is what American Made's site never answers. The rest are what turns an hourly rate into a real bill.

  1. Missing from their site

    Do the published aircraft rates include fuel, or is fuel billed separately?

    The site does not say, and it is the difference between two rates that look identical and are not.

  2. What gets billed on top of the hourly rates, and roughly how much per hour does it add?

    The site notes extras beyond the hourly figures. Ask for the all-in number per hour, not the base rate.

  3. Which instructor rate applies to each rating I plan to do, and does the higher tier start on day one of that rating?

    This school prices some instruction above its primary rate. Knowing when the step-up starts keeps the later ratings from surprising you.

  4. Do you offer block rates or prepay discounts, and what is the refund policy if I stop partway?

    Block discounts are common and rarely published. The refund terms matter more than the discount.

  5. What do you charge for the written test, the checkride, and the examiner's fee?

    The DPE fee alone runs $800 to $1,200 in most of the country and is almost never in a quoted hourly rate.

  6. How many trainers and how many full-time instructors do you have right now?

    Availability decides your pace, and pace decides your total more than the hourly rate does.

In the app

Track it against American Made's rates.

American Made Aviation's rate card is in the PilotBound app. Choose American Made when you set up and the app prices your training at its rates, then tracks every flight you log against the projection.

Download on the App Store

Questions

How much does it cost to get a private pilot license at American Made Aviation?

American Made Aviation publishes $150 per hour for the Van's RV-12iS light sport, Garmin glass and $65 per hour for instruction on it, checked October 12, 2026. Applied to those published rates, PilotBound estimates a private pilot certificate at about $16,945, in a range of $14,600 to $19,300. That covers roughly 72 hours of flying and instruction plus the one-time fees most quotes leave out, including the written test, the examiner's checkride fee, a medical, and study materials. It is a PilotBound estimate built on the school's published rates, not a quote from American Made Aviation.

How long does it take to get a private pilot license at American Made Aviation?

Flying twice a week, PilotBound estimates about 6 months at American Made Aviation to reach the private pilot checkride, at roughly 72 hours. Pace is the single biggest variable: flying once a week typically stretches the timeline and raises the total, because time between lessons gets spent re-learning. Weather, aircraft availability, and instructor turnover all push the same direction.

Is American Made Aviation a Part 61 or Part 141 flight school?

American Made Aviation trains under Part 61, the flexible path. There is no FAA-approved syllabus to follow, so lessons can be scheduled around your life and adapted to your pace. The tradeoff is a slightly higher paper minimum for the private certificate (40 hours versus 35) and, for most students, no VA benefit eligibility.

Do American Made Aviation's aircraft rates include fuel?

American Made Aviation publishes $150 per hour for the Van's RV-12iS light sport, Garmin glass, a rate that does not say whether fuel is included. Ask before you budget: if the rate turns out to be dry, fuel adds roughly $30 to $60 per hour on top. PilotBound's estimate uses the rate exactly as published. Rates checked October 12, 2026.

What ratings can you train for at American Made Aviation?

American Made Aviation trains Private Pilot. Instruction runs $65 to $75 per hour depending on the rating and the aircraft, since advanced and type-specific instruction is priced above the standard rate. PilotBound's estimator on this page prices any of these paths on American Made Aviation's own published rates.

Sources

Estimates use American Made Aviation's published Van's RV-12iS light sport, Garmin glass and instructor rates (checked October 12, 2026), shown in USD for planning only. Real cost varies by student, weather, and pace. A range, not a quote.

PilotBound is not affiliated with, endorsed by, or sponsored by American Made Aviation. School names are used only to identify the school. Estimates use PilotBound's own completion-hours model, examiner-completion data where it exists and FAA minimums where it does not, applied to each school's published rates. They are PilotBound estimates, not the school's quote, and will differ from a school's own figures. Methodology · Disclaimer & removal policy.

Are you American Made? Every figure here is yours, shown with its source and date.

Plan the money before you commit.

A program price only makes sense next to what each rating costs on its own, what scholarships exist, and what borrowing actually looks like.

What each rating costs

Per-rating ranges, with the fees most quotes leave out.

Scholarships first

Verified flight training scholarships. Every scholarship dollar is a dollar you never finance.

If you borrow

Compare lenders and see the real monthly payment before you sign.