Rates partly published · Council Bluffs, IA
Flight training at Revv Aviation
No instructor rate. Revv publishes rates for all 4 of its airplanes and nothing for instruction, so there is no total on this page. Instruction is the second biggest line on a training bill, after the airplane.
Checked August 6, 2026 against Revv Aviation flight school page.
- Based at
- Council Bluffs Municipal Airport(KCBF)
- FAA part
- Not stated on their site
- Phone
- 712-323-2173
- Website
- revvaviation.com
What Revv publishes
Checked August 6, 2026 · Source
| Aircraft | Published rate | Notes |
|---|---|---|
| Cessna 150 | $130/hr | Published as "from $130/hr". A two-seater, so not the right airplane for the Commercial. |
| Cessna 172 | $175/hr | Published as "from $175/hr". |
| Piper Arrow | $208/hr | Published as "from $208/hr". Retractable, so this is the complex airplane. |
| Piper Seminole | $375/hr | Published as "from $375/hr". The twin. |
Every figure Revv publishes is a FROM price, not a rate: the site says "Cessna 172s from $175/hr" and never gives a per-tail number, so the real rate for the airplane you fly may be higher. The site also does not say whether fuel is included.
What to ask when you call
The marked ones are what Revv's site never answers. The rest are what turns an hourly rate into a real bill.
What do you charge per hour for flight instruction, and is ground instruction billed at the same rate?Missing from their site
This is the number that is missing from the site. Ground is often billed separately and at a different rate.
Does the instructor rate change for the Instrument, Commercial, or CFI, or is it flat across everything?Missing from their site
Plenty of schools charge more for advanced instruction. A flat rate quoted for the Private can climb later.
Do the published aircraft rates include fuel, or is fuel billed separately?
The site does not say, and it is the difference between two rates that look identical and are not.
What does the airplane actually cost, rather than what does it start from?
Every published price is a "from" figure. The spread between the cheapest and dearest tail in a type is exactly what the site leaves out.
Are you still training at Muscatine and Davenport?
Revv absorbed Carver Aero, whose Muscatine and Davenport bases still appear in AOPA. Revv's own site now lists only Aurora, Council Bluffs and Omaha, and carveraero.com redirects here.
Do you offer block rates or prepay discounts, and what is the refund policy if I stop partway?
Block discounts are common and rarely published. The refund terms matter more than the discount.
What do you charge for the written test, the checkride, and the examiner's fee?
The DPE fee alone runs $800 to $1,200 in most of the country and is almost never in a quoted hourly rate.
How many trainers and how many full-time instructors do you have right now?
Availability decides your pace, and pace decides your total more than the hourly rate does.
What to compare their answer against
Not Revv's rates. The middle of what 5 Iowa schools charge, to hold your phone quote against.
Trainer, median
$160/hr
Range $91 to $190
Instruction, median
$60/hr
Across 5 schools with published rates
From the schools here that publish full rate cards, the same sample behind the Flight Training Cost Report. Revv is not in it.
Called them? Send us what they said.
Send the number over and Revv Aviation gets a full listing with an estimate, marked as sourced by phone on the date you called.
Send what they told youWhat we checked
A three-state operator (Aurora IL, Council Bluffs IA, Omaha NE) with the largest published fleet found in Iowa, and no instruction rate anywhere across 30 crawled pages. AOPA still lists Revv at Muscatine and Davenport, the old Carver Aero bases; Revv's own site does not. Checked August 6, 2026.
Are you Revv Aviation? Send your rate card and this becomes a full listing with an estimate, free. Or have it removed.
PilotBound is not affiliated with, endorsed by, or sponsored by Revv Aviation. School names are used only to identify the school.Rates shown are the school's own published figures with the date we checked them. This page carries no PilotBound estimate, because the school does not publish enough for one. Disclaimer & removal policy.
Plan the money before you commit
A program price only makes sense next to what each rating costs on its own, what free money exists, and what borrowing actually looks like.
What each rating costs
Honest per-rating ranges, with the fees most quotes leave out.
Free money first
Verified flight training scholarships. Every scholarship dollar is a dollar you never finance.
If you borrow
Compare lenders and see the real monthly payment before you sign.